[1]
2026. Risk Delay Evaluation for Industrial Projects in Iraq Using a Modified TOPSIS Method. Al-Noor Journal of Engineering Management and Computer Science. 2, 3 (Aug. 2026), 364–387. DOI:https://doi.org/10.71229/eg8kv185.