[1]
“Risk Delay Evaluation for Industrial Projects in Iraq Using a Modified TOPSIS Method”, Noor J. Eng. Mang. Comp. Sc., vol. 2, no. 3, pp. 364–387, Aug. 2026, doi: 10.71229/eg8kv185.